Ridges Installation
Laying
the top course of tiles when rafter lengths suits a full tile
course. The back edge of the tile must be straightened out.
This is usually done in the bender. Laying the top course
of tiles when rafter length does not suit a full tile course.
Procedure
Measure
the distance (A) from the last tile to the ridge board (Fig
12). Add 50mm to the measurement (turn up allowance) and mark
the tile to be cut (Fig 13).
Bending
and Cutting
Place
the full-tile in the full-tile bending attachment which can
be bolted to the bender. Line up the marks showing the bend
line and bend the tile upwards (Fig. 7). Tiles can be bent
in either the bender or, depending on the length, with the
full-tile bending attachment. Finally cut along the marked
cutting line using the guillotine or hand shears. It is essential
to bend the tile before cutting to avoid tile distortion.
Installing
the Top Course of Tiles
Install
the top course of tiles to the ridge board by nailing each
tile through the up stand to the ridge board in 4 places and
nailing the bottom edge as previously described. Ensure that
the top course of tiles follows the same pitch as the other
courses (Fig. 14).
|